Home » Permit Application Builder » Garage w/Living Space
We are here to save you time.
In order to adequately and efficiently process a building permit application, the following information is required to be submitted electronically to the municipal office (some offices may accept paper submissions).
The applicant is required to check every box below and provide the applicable information to indicate that they fully understand what information is required for a complete application. Failure to check any box, provide all required information, or sign below will result in the application being tabled until all information is received.
(All specified information listed under each box is required to be submitted; checking the box indicates you have included this information).
Ensure all contact info including email address is provided. Ensure to include Civic Address along with Lot, Block, and Plan, or Legal Land Location when not located in a subdivision.
Provided by municipal office, or CCASK online application where acceptable to the municipality.
See SPACIAL SEPARATION REQUIREMENTS for fire-protection requirements at side yards.
This is related to where the building sits on the property / how close it is to property lines. The designer is to understand that notwithstanding Zoning setbacks, where the local Fire Department Response time cannot meet 10-minutes or less in 90% of their calls, there are more stringent requirements for the building face when built within 2m (8 feet) of the property line, such as no windows permitted, 5/8” drywall, and no combustible cladding.
Must include the following:
See “WHEN IS AN ENGINEER REQUIRED?’ below.
See ‘TALL WALL DESIGN GUIDE’ to determine if an engineer is required or comply with acceptable framing sizes and techniques.
PRESCRIPTIVE PATH:
Plans must show the following:
PERFORMANCE MODEL PATH:
Submit the Energy Modelling Report from a qualified energy modeler; R-Value information on plans must meet the values shown in the model.
(All specified information listed under each box is required to be submitted; checking the box indicates you have included this information).
Have spray foam installation contractor submit the CCASK Worksheet or their own install data sheet. *IMPORTANT: DO NOT USE ‘FROTH PACK’ or SIMILAR ‘DIY’ retail products as insulation, air-barrier, or vapour barrier. Owner installed spray foam products do not comply.
Professionally designed and sealed drawings, or drawings with professional engineer design review and sealed are required for the following conditions:
fire department response time meets 10-minutes or less in 90% of calls (applies to most cities, some larger towns with hybrid FD).
fire department response time DOES NOT meet 10-minutes or less in 90% of calls (applies to all RM’s, resort villages, hamlets, many towns, and even parts of some cities).